Electric truck charging at your plant

E-mobility

Who it applies to
Plants, distribution centers and logistics yards that receive or ship with electric semi-trucks
Charging type
DC fast charging (mode 4) inside the yard
The real project
Medium-voltage service, transformer or substation, and protection
What we assess
Measured load curve, point-of-connection capacity and yard operations
Add-ons
Battery to shave the charging peak and, if it makes sense, solar generation
Operation
Under a GTO Vigía contract

A semi-truck charger is a substation with a cable

DC fast charging for electric trucks inside your yard. What decides the project is not the charger: it is the medium-voltage service, the transformer and the protection that feed it.

The power at stakeMedium voltageBattery and solarWhat we doQuestionsWhen it is not for you

The power at stake

A charging yard can draw as much as a production building

01

DC fast charging

A semi-truck that has to head out again in a few hours needs DC charging, in what Agreement A/108/2024 (Acuerdo A/108/2024) classifies as mode 4. This is high-power equipment fed from a dedicated transformer or from the plant's substation.

02

The sum that changes the project's scale

Four 350 kW chargers add up to 1.4 MW if they run at the same time (illustrative example). For many plants that is a large share of their contracted demand, and it forces a review of the medium-voltage service before buying a single charger.

Aerial view of semi-trucks parked in a yard.
Logistics yard
Semi-trucks plugged in to charge.
Semi-truck charging
Fast-charging connectors in their holder.
Fast-charging connectors
Fleet of electric vans charging.
DC charging

Medium voltage

The real project starts at the point of connection

If the available capacity falls short, truck charging means a load increase or a new connection. Agreement A/108/2024, issued by the then CRE (DOF September 10, 2024), refers the connection of charging infrastructure to the load-center regulatory manual (Manual Regulatorio de Centros de Carga) of the Grid Code (Código de Red): below 69 kV it is handled with the Supplier or the Distributor and from 69 kV with CENACE. It is advisable to confirm the current process with the CNE.

Inside the fence line the scope is a substation: medium-voltage switchgear, a dedicated or upgraded transformer, panels, protection coordination, grounding and raceways to each charger. Each charging circuit is protected under article 625 of NOM-001-SEDE-2012, with overcurrent protection for continuous duty of no less than 125 % of the equipment's maximum load and a lockable disconnecting means.

High-power chargers are power electronics. Like any load of that type, it is worth reviewing their effect on the plant's power quality and on Grid Code compliance before connecting them.

Battery and solar

When the grid falls short, the battery shaves the charging peak

A battery bank charges slowly from the grid, or from on-site solar generation, and delivers the high power during the truck's charging session. That way the point of connection sees a smaller peak. It is an alternative to expanding the substation, or a way to wait for the load increase without stopping yard operations.

How it is decided

Three scenarios are compared with numbers: expand the substation, install a battery, or limit power through load management and accept longer sessions. The answer depends on your measured load curve and your yard operations, not on a preference for a technology.

What we do

From the point of connection to a charged truck

We start with your bill, metering at the point of connection and yard operations: how many trucks, at what time and for how long they can stay plugged in.

01

Feasibility

Available capacity at the point of connection, measured load curve and power scenarios.

02

Medium-voltage engineering

Substation, transformer, protection, grounding and power quality studies.

03

Connection permitting

Load increase or new connection with the Supplier, the Distributor or CENACE, depending on voltage.

04

Supply and installation

DC chargers, battery and solar if the scenario includes them, civil and electrical works, and commissioning.

05

Operation and maintenance

Under a GTO Vigía contract: chargers, substation and battery with one accountable partner.

Questions

What clients ask before hiring us

Can I connect the chargers to the substation I already have?
Sometimes, yes. It depends on the transformer's margin during the hours the trucks will charge and on the capacity of the existing switchgear and protection. That is measured before deciding.
How long does the load increase take?
It depends on the area and on the capacity available on the grid. That is why feasibility comes first: if the timeline does not fit your fleet schedule, a battery or load management can cover the interim period.
Does it make sense to add solar to charge trucks?
Only if the charging schedule matches generation or if there is a battery to store the energy. It is evaluated with the yard's actual operations.
Do you sell the trucks?
No. We do the electrical engineering, the substation, the charging infrastructure and its operation.

When it is not for you

If your operation does not require it, do not buy fast charging

We tell you at the first meeting

If your trucks spend the night in the yard and have hours to spare for charging, high-power DC fast charging may be unnecessary. Lower-power chargers and load management ask much less of the substation.

If the yard is not yours or your lease does not allow you to expand the substation, resolve that before the electrical project. The medium-voltage investment stays with the property.

And if the number of electric trucks is not decided yet, do not size the substation for an imaginary fleet. The raceways can be left ready and you can grow in stages.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Interested in a truck charging project?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Continue with

Related services

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

Diagnostic with no down payment

Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.

02

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

03

Third-party systems

We service plants installed by others, starting with a condition survey.

Partners with trademark-use authorization

  • Jenbacher
  • Guascor Energy
  • Hering
  • Pylontech
  • Huawei

Group clients since 1983

  • alestra
  • AT&T
  • Banamex
  • BBVA
  • The Walt Disney Company
  • HSBC
  • Lockheed Martin
  • NASA
  • PwC
  • Santander
  • Siemens
  • Telefónica
  • Televisa
  • Telmex
  • Transportation Security Administration
  • Verizon
  • ICA
  • ASA
  • Nielsen
  • Bosque Real
  • Logistik

Also: Cuadritos, Productora Nacional de Papel and Telemar.