GTO Energy · Energy Experts Contact
Plastic injection molding machine running inside a plant.

Plastics

Industries

Load profile
High and continuous, with spikes in the heating cycle and at mold startup
Main problem
Harmonic distortion from drives and heaters, plus a high demand charge
Why it matters
Plastics is among the most electricity-intensive processes per unit of product weight
Applicable families
A · Diagnostics and Quality · B · Storage · C · On-site Generation
Typical threshold
Medium voltage, consumption from 150,000 kWh a month

Your injection molding machines are the most nonlinear load in the plant

Injection, extrusion and blow molding. High, continuous and electrically dirty consumption: the combination that pays back a power quality study fastest.

The problemDoes it apply to me?What to do firstWhen it is not for you

This sector's problem

Every variable frequency drive you installed to save energy pollutes your electrical system

Drives are good engineering: they reduce consumption and extend motor life. But they draw current in pulses, and a plant with dozens of them —plus the heater band elements and the controller power supplies— ends up with a harmonic spectrum that no conventional capacitor bank can fix.

The classic symptom is a capacitor that swells or burns out shortly after installation. It is not a poor-quality capacitor: it is resonance. The bank's capacitance and your system's inductance matched at a harmonic frequency and amplified the current instead of correcting it.

That is why in this sector no bank should be quoted without measuring the spectrum. Correcting power factor without having looked at the harmonics is the most common way to spend money making the problem worse.

01

The symptom

Capacitors that degrade quickly, hot transformers, protective devices that trip without a fault.

02

The likely cause

Resonance between the correction bank and the harmonic spectrum of your drives.

03

The study that solves it

Spectrum measurement by harmonic order and a resonance study before sizing anything.

Plastics.
Plastics
Metering at switchboards.
Metering at switchboards
Battery storage.
Battery storage
Switchgear and protection.
Switchgear and protection

Signs it applies

What you can read in your own operation

01

Capacitors that fail early

It is the clearest sign of resonance. If you have already replaced a bank, measure before replacing the next one.

02

Many variable frequency drives in the plant

Each one adds to the spectrum. The count matters more than the individual rating.

03

Steady consumption above 150,000 kWh a month

Flat, high profile: a good candidate for solar generation and for power factor correction with a short payback.

04

Mold or extruder that cannot cool down mid-run

If an interruption ruins the material in the machine, backup has a number attached to it.

How it is verified

In an initial review, with your bill on screen, we tell you what is worth measuring and what we would expect to find.

What to do first

What comes first in a plastics plant

The power quality study with harmonic spectrum. It is inexpensive relative to the rest of the catalog, has the shortest payback and keeps you from spending badly on what comes next.

Then the correction, sized on the measured spectrum: an automatic or dynamic bank, with filters where the harmonic order requires them, and a resonance study that backs the selection.

Solar fits this sector well because of the flat, continuous profile, but after correcting. And storage if demand charges exceed 25 %.

On payback

A well-sized capacitor bank in a plant with a power factor surcharge is usually the project with the shortest payback in the whole catalog. We say so without giving a number because it depends on your surcharge, and your surcharge is on your bill.

When it is not for you

What we will tell you not to do

We tell you at the first meeting

If your bill shows no power factor surcharge and you have had no capacitor failures or unexplained trips, the full study can wait. We read your twelve bills and confirm it for you.

If you were quoted a capacitor bank without a harmonics measurement, ask that supplier for the resonance study before signing. If they do not have it, do not sign.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

We measure before we propose

Seven days with a Class A analyzer at your facility, before quoting.

02

One accountable partner

Engineering, supply and installation inside your fence line.

03

Diagnostic with no down payment

Fully creditable if you implement. No finding, no charge.

04

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

05

Operation and maintenance

GTO Vigía: monitoring, monthly reporting and priority service.

06

Third-party systems

We service plants installed by others, starting with a condition survey.