GTO Energy · Energy Experts Contact

Contact

Office
+52 477 102 5023
WhatsApp
442 529 6184
Email
info@gtoenergy.com
Location
León, Guanajuato, Mexico
Coverage
Northern, central and southern Mexico, and LATAM
Response
Same business day if you write before 16:00

First we understand your plant. Then we measure.

In a short meeting, at your plant or online, we review your bill with you, on screen, and tell you what is worth measuring. You pay when the package pays for itself.

Who to talk toWhat to have at handWhat happens nextForm

Who to talk to

Three different conversations, three entry points

Not everyone arrives with the same question, and putting everyone through the same funnel wastes time on both sides. Tell us up front and we will route you correctly.

01

"I want to understand my bill"

This is the most common entry point. Book an initial review and we read it with you, on screen: demand charge, power factor and peak hours.

02

"I received a notice" or "my customer is asking for the compliance report"

You have a deadline. Call us at +52 477 102 5023 and say so: that changes the priority and the scope, and it is usually a shorter job than a full diagnostic.

03

"I already have a system and I do not know if it is OK"

Condition survey. It applies even if someone else installed it, and it is quoted separately: it is useful to you even if someone else does the maintenance afterwards.

If you do not know which of the three you are in, it does not matter. Call and we will figure it out in five minutes.

What to have at hand

This is what we work with in the review; we ask for the rest later

01

Twelve months of CFE bills

Twelve, not one. The weight of the demand charge and the power factor vary with the season and the production cycle. A single month leads to wrong conclusions. Having them at hand in the meeting is enough.

02

The cover page of your contract

It shows your voltage level and your contracted demand. That is the data point that defines whether the Grid Code (Código de Red) applies to you.

03

What concerns you, in your own words

"I received a notice", "my plant keeps going down", "the bill went up and I do not know why". That is worth more than a filled-in form.

04

Nothing else

We do not need drawings or an equipment inventory for the initial review. If they are needed later, we will ask then.

How it is verified

If you do not have the bills at hand, your CFE portal has them. If not, tell us and we will explain how to download them.

What happens next

Three steps, and you decide at each one

First, the initial review. A short meeting with your bill on screen. We tell you what we see, what we would expect to find when measuring, and which solution family your profile points to.

Then the technical qualification visit. An hour or two at the plant to see the installation, the switchboards and the loads we suspect. That defines the metering scope — not a service catalog.

And then the diagnostic proposal. With scope, timeline and fee. No down payment, creditable against your investment if you implement with us, and no charge if the study does not find a profitable package.

What will not happen

We will not call you every week. We will not send you a proposal without presenting it. And we will not quote equipment before we have measured: it is the one house rule that is not negotiable.

Form

Book your initial review

The consumption and demand charge fields are optional: if you do not know them, we go over them together on the bill. All we really need is how to reach you and what concerns you.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

We measure before we propose

Seven days with a Class A analyzer at your facility, before quoting.

02

One accountable partner

Engineering, supply and installation inside your fence line.

03

Diagnostic with no down payment

Fully creditable if you implement. No finding, no charge.

04

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

05

Operation and maintenance

GTO Vigía: monitoring, monthly reporting and priority service.

06

Third-party systems

We service plants installed by others, starting with a condition survey.