Why your CFE bill does not tell you whether you meet the Grid Code

Your bill shows an average power factor for the period. The standard is not assessed that way. A plant can have a flawless average and still fall outside the criterion, without the bill even hinting at it.

Technician measures current with a clamp meter at a switchboard.
A monthly average hides the intervals the Grid Code does check.

Average versus percentile: two different questions

The CFE bill gives you one number per billing period. It is an average: it adds up the whole month and divides. It is useful for calculating your penalty or your credit, and nothing else.

The Grid Code (Código de Red) does not ask what your average was. It asks whether the value held, and for that it is measured in short intervals and assessed on what proportion of those intervals comply. That is a percentile criterion, and it is a completely different question.

The difference matters because the two answers can point in opposite directions. A plant with a 0.98 average and motor starts that drag it down for twenty minutes every shift has a bill that looks fine and a profile that does not comply. The rest of the month swallowed it in the average.

Why the average hides exactly what matters

Think about what a monthly average does: it spreads the twenty bad minutes across the forty-three thousand two hundred minutes of the month. They vanish. But those twenty minutes happened, they were measured, and under a percentile criterion they count as non-compliance.

And they are precisely the minutes that cause everything else: the simultaneous start that sets your billable demand, the transient that trips the protection, the moment the capacitor bank cannot keep up. The average erases exactly the information your plant needs.

That is why a serious compliance report is not made from twelve bills. Bills say how much you paid; they do not say what happened.

Figure 1
The average sits above the threshold; many intervals do not
1 10 20 30 DAYS OF THE MONTH POWER FACTOR BY INTERVAL Average on the bill 0.98 Criterion threshold 33 intervals below threshold
Each dot is a short-interval measurement; the cyan dots are below the criterion threshold. The threshold value comes from the Load Center Connection Regulatory Manual (Manual Regulatorio de Conexión de Centros de Carga) and is not shown here. Illustrative data.

What actually answers the question

A measurement campaign. A Class A analyzer installed at the service entrance and at the suspect switchboards, for at least seven calendar days, per IEC 61000-4-30.

Seven days, not two, because you need to capture the full operating cycle: the shifts, the weekend, the Monday startup and the maintenance shutdown. Any given Tuesday does not represent your month.

Class A, not just any instrument, because the standard defines how each parameter is aggregated, over what window and with what accuracy. That is what makes two different analyzers, at the same point and at the same time, give the same result — and what makes your compliance report defensible before a third party.

That campaign yields the data the bill will never give you: the full distribution, not the average. And with it, whether you comply or not, and at exactly which moments you stop complying.

Figure 2
What the campaign delivers: the full distribution, not the average
CAMPAIGN REPORT · POINT: SERVICE ENTRANCE CLIENT: [ANONYMIZED] · 7 DAYS · CLASS A ANALYZER · IEC 61000-4-30 NUMBER OF INTERVALS Criterion threshold Period average ← LOWER HIGHER → POWER FACTOR 13 % of intervals below threshold Below threshold Above threshold
Deliverable format of a seven-day campaign, with client data removed. The threshold value comes from the Load Center Connection Regulatory Manual. Illustrative data.

A warning about the figures going around

Percentages, thresholds and dates circulate on this topic that almost no material cites against its instrument published in the Official Gazette (Diario Oficial). We checked several and could not find the reference: repeating them would be easy and would do you no good.

What is verifiable and sufficient to decide is the above: the current framework is RES/550/2021, published in the DOF on December 31, 2021, and the power factor requirement for load centers is set out in the Load Center Connection Regulatory Manual.

When we present a number to you, it will come with its reference. And if someone presents one without it, ask for it before making an investment decision on that basis.

The summary in one sentence

Your bill answers how much you paid. The standard asks how your plant behaved. Only a measurement campaign answers the second, and that is the one that decides whether you have a problem.

Keep reading

Related

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

Diagnostic with no down payment

Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.

02

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

03

Third-party systems

We service plants installed by others, starting with a condition survey.

Partners with trademark-use authorization

  • Jenbacher
  • Guascor Energy
  • Hering
  • Pylontech
  • Huawei

Group clients since 1983

  • alestra
  • AT&T
  • Banamex
  • BBVA
  • The Walt Disney Company
  • HSBC
  • Lockheed Martin
  • NASA
  • PwC
  • Santander
  • Siemens
  • Telefónica
  • Televisa
  • Telmex
  • Transportation Security Administration
  • Verizon
  • ICA
  • ASA
  • Nielsen
  • Bosque Real
  • Logistik

Also: Cuadritos, Productora Nacional de Papel and Telemar.