GTO Energy Contact
Home>Industries>Agribusiness and greenhouses Energy experts About usCalculators+52 477 102 5023info@gtoenergy.com
Greenhouse with sprinkler irrigation and an electrical control cabinet between the crop rows.

Agribusiness and greenhouses

Industries

Load profile
Pumping and irrigation, cold rooms, heating and ventilation that change with the season
Distinguishing feature
A greenhouse can use the electricity, heat and CO₂ of a gas genset at the same time
Main problem
Demand that follows the season and a CFE contract that stayed fixed
Applicable families
C · On-site Generation · A · Diagnostics and Quality · B · Storage
Typical threshold
Medium voltage, often at the end of long distribution lines

In a greenhouse, heat is worth as much as electricity

High-tech greenhouses, packing plants, cold storage and technified irrigation. Operations where energy follows the season, not the plant calendar.

Cogeneration module: gas genset, exhaust heat recovery and a heat exchanger sending hot water to the plant, with a GTO Energy technician
The problemDoes it apply to me?What to do firstWhen it is not for you

This sector's problem

Demand changes with the season while the CFE contract stays fixed

A greenhouse or packing plant does not consume the same in January as in July. Heating on cold nights, ventilation and cooling in the heat, cold rooms full at harvest and nearly empty outside it. If the contracted demand and the tariff were set with a single month in mind, you overpay the rest of the year.

A greenhouse also has something almost no other industry has: it can use the electricity, heat and CO₂ of a gas genset at the same time. It is the case where cogeneration puts almost everything it burns to use. We explain it in greenhouse cogeneration.

And many of these operations are far from town, at the end of long distribution lines. Voltage swings and outages hit pumps, fans and climate controllers just when the crop cannot wait.

01

Seasonal measurement

One campaign in the peak season and, if needed, another in the low one. Without that, any adjustment is a guess.

02

Heat and CO₂

If you heat with gas, cogeneration is evaluated with its three products: electricity, heat and CO₂.

03

Continuity

Backup for pumping, climate control and cold rooms, sized for what cannot stop.

Agribusiness and greenhouses.
Agribusiness and greenhouses
Metering at switchboards.
Metering at switchboards
Battery storage.
Battery storage
Switchgear and protection.
Switchgear and protection

Signs it applies

What you can read in your own operation

01

You heat with gas in the cold season

The entry condition for evaluating cogeneration. If you also inject CO₂, the case gets stronger.

02

Cold rooms or pre-cooling tunnels

A continuous load that sets much of the demand. Its operation is reviewed before thinking about generation.

03

Power factor surcharge on your bills

Pumps and fans running without correction. It is fixed without major construction.

04

Stoppages from outages or low voltage

If an outage costs you product, backup stops being optional and is sized on that cost.

How it is verified

In an initial review, with your bill on screen, we tell you what is worth measuring and what we would expect to find.

What to do first

The order in a greenhouse or packing plant

Measurement first, in the season that weighs most. With that, the contracted demand is adjusted and the power factor corrected, neither of which requires major construction.

Then the thermal decision: if heat and CO₂ are used for much of the year, cogeneration is evaluated seriously. If not, solar generation on the ground or on the packing buildings is usually the next step.

Backup comes last, sized for the loads that truly cannot stop: pumping, climate control and refrigeration.

About the thermal engineering

We handle the thermal engineering with specialized partner firms. We do not improvise it and we do not pretend to do it alone.

When it is not for you

What we will tell you not to do

We tell you at the first meeting

If your greenhouse uses neither heating nor CO₂, we will not propose cogeneration: without continuous thermal demand it does not pay for itself.

If your operation has a short season and is on low voltage, let us first review the tariff and the contract. Often that is all it takes.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

Diagnostic with no down payment

Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.

02

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

03

Third-party systems

We service plants installed by others, starting with a condition survey.

Partners with trademark-use authorization

  • Jenbacher
  • Guascor Energy
  • Thermax
  • Hering
  • Pylontech
  • Huawei
  • LONGi

Group clients since 1983

  • alestra
  • AT&T
  • Banamex
  • BBVA
  • The Walt Disney Company
  • HSBC
  • Lockheed Martin
  • NASA
  • PwC
  • Santander
  • Siemens
  • Telefónica
  • Televisa
  • Telmex
  • Transportation Security Administration
  • Verizon
  • ICA
  • ASA
  • Nielsen
  • Bosque Real
  • Logistik
  • Biotek Power
  • Productora Nacional de Papel
  • Telemar