GTO Energy · Energy Experts Contact

Projects

Group track record
ESI 1983 · PMI 2001 · GIS Power 2014 · GTO Energy CO 2019
Publication standard
Executing company, year and scope. No superlatives we cannot back up
Direct references
Clients who agree to take the call, depending on the project

Every project, with who built it and when

The group has spent four decades building mission-critical electrical infrastructure and cogeneration plants. Here are the projects that document it, attributed to the company that executed them — because misattributing them would be easier and less useful.

Group projectsBy GTO Energy COStandardThe sample report

Group projects

What the group has executed, with name and date

These projects were executed by PMI and GIS Power, companies in the same group as GTO Energy CO. We say so explicitly on each one because the alternative —presenting them as our own— is the practice this site avoids.

We include them because they are evidence of the engineering capability a GTO Energy project has access to, and because in cogeneration and mission-critical infrastructure there is no way to demonstrate competence without completed work.

2014

Cogeneration-powered data center · Querétaro

Executed by PMI, now GIS Power. A data center whose electricity and chilled water are produced entirely on site: heat from the engine-generator drives absorption cooling. 4.2 MW cogeneration.

Industrial park

Industrial park with on-site generation · Celaya

Executed by the group. An industrial park designed with its own generation as a competitive advantage for its tenants, instead of depending on grid expansion.

Logistics sector

Cogeneration at a logistics center · Bajío

Executed by GIS Power. 9.5 MW installed. It is the kind of scope that, by capacity, belongs to GIS Power and not to GTO Energy.

Mission critical

Tier 3 to Tier 5 data centers · Mexico and Brazil

Executed by PMI and ESI over three decades, for clients in the financial, telecommunications and engineering sectors. It is the origin of the continuity discipline we apply to critical loads today.

The group's aggregate figures —total installed capacity and investment executed— are pending confirmation with their cut-off date and entity. We will not publish them until then.

Industrial building.
Industrial building
Metering at switchboards.
Metering at switchboards
Battery storage.
Battery storage
Switchgear and protection.
Switchgear and protection

By GTO Energy CO

Ours, once you authorize us to publish them

GTO Energy CO has operated since 2019 and has its own delivered portfolio. It is not here yet for an administrative reason, not for lack of work: publication permission is requested from the client when the contract is signed, and projects that predate that practice do not have it.

So we are asking for authorization retroactively. As soon as a client grants it, the case goes up with the only things that matter: what problem the plant had, what was measured, what was done and what changed, with the corresponding unit.

In the meantime there are two alternatives that work better than a logo: we describe the technical scope to you without naming the client, and we put you on the phone with whoever agreed to give a reference.

If you prefer not to appear

We respect that without discussion, and the project is published anonymously or not at all. A case bearing the name of a client who did not authorize it is not worth what it costs.

The standard

Three conditions for a project to appear here

01

Correct attribution

The company that executed the project, with its name and the year. If PMI did it in 2012, it says PMI and it says 2012. The group adds credibility; misattribution takes it away.

02

Written client authorization

It is requested when the contract is signed, not when the work is finished. If the client prefers to remain anonymous, the case is published describing the plant type and capacity, without the name.

03

Figures that can be backed up

Every published number comes from a documented measurement, with its baseline and its verification method. And superlatives —"the first to", "the largest in"— only if we can show where they come from.

How it is verified

That last point has cost us leaving off this site some phrases the group does publish in other materials. We prefer to review them rather than carry them along.

The best reference

Ask for the sample report

A project brochure tells you who we have sold to. A diagnostic report tells you how we work, and it is much more useful for deciding.

We can share a real report with the client data removed: the full metering campaign, the adjusted baseline, the findings ranked by return and the measurement and verification plan. It is the deliverable you will receive if you hire us, and you can show it to your team before committing a single peso.

What it includes

Load profile for the seven campaign days · power factor by interval, not average · harmonic distortion by order · status against the eight Grid Code (Código de Red) parameters · findings with return calculated measure by measure · M&V plan under IPMVP.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

We measure before we propose

Seven days with a Class A analyzer at your facility, before quoting.

02

One accountable partner

Engineering, supply and installation inside your fence line.

03

Diagnostic with no down payment

Fully creditable if you implement. No finding, no charge.

04

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

05

Operation and maintenance

GTO Vigía: monitoring, monthly reporting and priority service.

06

Third-party systems

We service plants installed by others, starting with a condition survey.