Load profile
Large motors in pumps, refiners and rolls, and steam drying, across three shifts
Main problem
Low power factor and demand set by large motor starts
Distinguishing feature
Continuous steam drying, one of the clearest conditions for evaluating cogeneration
Applicable families
A · Diagnostics and Quality · C · On-site Generation · D · Infrastructure
Typical threshold
Medium or high voltage, continuous operation

Here steam weighs as much as the kilowatt

Paper mills, corrugators, converters and packaging plants. Three-shift operations with large motors and, often, a boiler that never shuts down.

Cogeneration module: gas genset, exhaust heat recovery and a heat exchanger sending hot water to the plant, with a GTO Energy technician
The problemDoes it apply to me?What to do firstWhen it is not for you

This sector's problem

Motors set the demand and steam is bought separately

Pumps, refiners, rolls and extractors: the load is motors, many of them large and some oversized. The most common result is a low power factor and a demand set by the starts.

At the same time, the plant buys gas to produce drying steam, almost always continuously. Electricity and heat are bought separately, when a single machine could produce both.

That is the entry condition for cogeneration. It does not guarantee it will pay off, but it obliges you to evaluate it with your own plant's numbers.

01

Motors

Inventory and measurement of the main motors: actual load, starts and power factor per unit.

02

Correction

Power factor and, where there are drives, harmonics. Based on measurement, not on the bill average.

03

Heat balance

How much steam you use, at what pressure and on what schedule. It is the basis for deciding whether cogeneration pays off.

Paper, cardboard and packaging.
Paper, cardboard and packaging
Metering at switchboards.
Metering at switchboards
Battery storage.
Battery storage
Switchgear and protection.
Switchgear and protection

Signs it applies

What you can read in your own operation

01

A steam boiler in continuous operation

The entry condition for cogeneration. That is where the evaluation starts.

02

Power factor surcharge on your bills

Motors running lightly loaded. It is fixed without major construction.

03

The month's peak coincides with a start-up

There is a sequencing or starter adjustment that lowers demand without touching production.

04

Old motors or motors rewound several times

They lose efficiency and run hot. They are measured before deciding which to replace.

How it is verified

In an initial review, with your bill on screen, we tell you what is worth measuring and what we would expect to find.

What to do first

The order in a paper or packaging plant

Motor and power factor measurement first. It is the cheapest step and the one that lowers the bill the following month.

Then the heat balance: how much steam, at what pressure and for how many hours a year. That decides whether cogeneration pays off in your plant, and at what size.

Infrastructure last: substation, switchgear and protection sized for what the operation truly needs.

About the thermal engineering

We handle the thermal engineering with specialized partner firms. We do not improvise it and we do not pretend to do it alone.

When it is not for you

What we will tell you not to do

We tell you at the first meeting

If your plant only converts or prints and does not use steam, cogeneration does not pay for itself. There the work is on motors and power factor.

If you were offered to replace all the motors at once, first ask for the load measurement of each one. Often it makes sense to replace some and adjust others.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

Diagnostic with no down payment

Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.

02

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

03

Third-party systems

We service plants installed by others, starting with a condition survey.

Partners with trademark-use authorization

  • Jenbacher
  • Guascor Energy
  • Thermax
  • Hering
  • Pylontech
  • Huawei
  • LONGi

Group clients since 1983

  • alestra
  • AT&T
  • Banamex
  • BBVA
  • The Walt Disney Company
  • HSBC
  • Lockheed Martin
  • NASA
  • PwC
  • Santander
  • Siemens
  • Telefónica
  • Televisa
  • Telmex
  • Transportation Security Administration
  • Verizon
  • ICA
  • ASA
  • Nielsen
  • Bosque Real
  • Logistik
  • Biotek Power
  • Productora Nacional de Papel
  • Telemar