GTO Energy · Energy Experts Contact

Industries

Coverage
Northern, central and southern Mexico, and LATAM
Entry criterion
Load centers at medium voltage from 1 MW, or at high voltage
What applies to all
Measure before proposing. Seven-day campaign with a Class A analyzer
If your sector is not here
The method is the same. Call us and we will talk it over with your bills on the table

The electrical problem is not the same in every plant

An induction furnace, an injection molding machine and a tannery boiler break different things. These pages explain what fails in each sector and in what order it is best to solve it.

The sectorsWhat applies to allContact

The sectors

Six sectors of Mexican industry

Each page covers the load profile, the dominant problem, the signs you can read in your own operation and the order in which it is best to tackle them.

Automotive.
Automotive
Food and beverage.
Food and beverage
Plastics.
Plastics
Metalworking.
Metalworking

What applies to all

The sector changes the diagnosis, not the method

Whatever your process, the conversation starts the same way: twelve months of billing on the table and a seven-day measurement campaign with a Class A analyzer. From that come your actual load curve, your harmonic profile and your compliance status against the Grid Code (Código de Red).

What changes between sectors is what we expect to find and in what order it is best to solve it. An induction furnace and a cold room do not break the same things, but they are measured the same way.

A

Diagnostics and Power Quality

The entry point. Measurement, Grid Code compliance report and correction. Applies in all six sectors.

B

Storage and Backup

Where demand charges exceed 25 % or continuity has a measurable cost.

C

On-site Generation

Solar where the profile justifies it; cogeneration only with continuous thermal demand.

D

Electrical Infrastructure

When capacity is short, drawings are missing or the installation no longer matches the load.

If your sector is not on the list, the method does not change. What changes is that we will ask you more questions on the first call.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

We measure before we propose

Seven days with a Class A analyzer at your facility, before quoting.

02

One accountable partner

Engineering, supply and installation inside your fence line.

03

Diagnostic with no down payment

Fully creditable if you implement. No finding, no charge.

04

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

05

Operation and maintenance

GTO Vigía: monitoring, monthly reporting and priority service.

06

Third-party systems

We service plants installed by others, starting with a condition survey.