Family A

Diagnostics and Power Quality

Solutions

What it includes
Investment-grade diagnostic, Grid Code (Código de Red) compliance report, power factor correction, harmonic filters, protection coordination, grounding, predictive testing
Who it applies to
Load centers at medium voltage with contracted demand from 1 MW, or at high voltage
Instrumentation
Class A analyzer compliant with IEC 61000-4-30
Measurement campaign
Minimum 7 calendar days per site
Timeline
2 to 14 weeks depending on the line
Deliverable
Report with adjusted baseline, M&V plan under IPMVP and return per measure

Before we sell you anything, we measure

It is the entry point to everything else. We install Class A equipment at your facility for seven days and leave with your actual load curve, your harmonic profile and your compliance status against the Grid Code.

The problemThe linesDoes it apply to me?How we workWhen it is not for you

The problem

Your CFE bill gives you an average. The standard is evaluated by percentile.

Almost every supplier shows up with a proposal before measuring anything. They quote you a capacitor bank without knowing whether your problem is reactive or harmonic, and sell you panels without having seen what time your peak occurs.

The CFE bill shows an average power factor for the period. The Grid Code is not evaluated that way: the requirement is verified on short-interval measurements and is met when the value holds for a very high percentage of the month's time. A plant with a 0.98 average and motor starts that pull it down for twenty minutes every shift can be outside the criterion without the bill even hinting at it.

They are two different questions, and only one of them costs you money. Measuring is the only way to know which one is yours.

Point of connection.
Point of connection
Metering at switchboards.
Metering at switchboards
Switchgear and protection.
Switchgear and protection
Thermography of connections.
Thermography of connections

The lines in this family

Three lines, one measurement

The seven-day campaign feeds all three. You measure once, and from it come the diagnostic, the compliance report and the correction plan.

Also in this family, without their own page

Work Plan filed with the authority · protection coordination · grounding systems · predictive testing · surge protection and shielding. Quoted within the scope of the study or separately.

Signs it applies

Four signs you can read on your own bill

01

Medium voltage from 1 MW, or high voltage

It is on the cover page of your CFE contract. It is the criterion that determines whether the Grid Code applies to you.

02

Power factor below 0.97 in any month

Check the bonus or penalty column on your last three bills. If there is a penalty, you are already paying for something that can be corrected.

03

Significant non-linear loads

Variable frequency drives, induction furnaces, welding equipment, rectifiers. Each one injects harmonic current into your installation.

04

You do not know whether you comply

It is the most common answer and the most useful. If nobody has measured, nobody knows — and that includes CFE until the requirement reaches you.

How it is verified

In an initial review, with your bill on screen, we tell you what is worth measuring and what we would expect to find. If the bill analysis does not justify the campaign, we tell you so and it ends there.

How we work

Four steps, always the same

01

Advisory

Twelve months of billing on the table and a technical qualification visit. That defines the scope of the measurement, not a catalog.

02

Design and installation

Installation of the Class A analyzer at the service entrance and at the suspect panels, for a minimum of seven calendar days, and the report within ten business days after the equipment is removed.

03

Permits

When the finding requires it, the Work Plan filed with the authority and the supporting file.

04

Monitoring

Monthly power factor and Grid Code compliance report under a reliability contract, so the data does not freeze the day we remove the equipment.

When it is not for you

There are plants we do not sell a study to

We tell you at the first meeting

If you are on low voltage and your bill shows no power factor penalty, the Grid Code does not apply to you and the measurement will cost you more than it will save you.

If your installation is less than two years old, the drawings are complete and the load has not grown, it is most likely fine and the study would only confirm it. We tell you so before charging for it.

If what you need is a compliance report to submit and nothing more, say so. It is a shorter and cheaper scope than an investment-grade diagnostic, and there is no point in paying for the latter.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Book an initial review of your plant

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

Diagnostic with no down payment

Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.

02

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

03

Third-party systems

We service plants installed by others, starting with a condition survey.

Partners with trademark-use authorization

  • Jenbacher
  • Guascor Energy
  • Hering
  • Pylontech
  • Huawei

Group clients since 1983

  • alestra
  • AT&T
  • Banamex
  • BBVA
  • The Walt Disney Company
  • HSBC
  • Lockheed Martin
  • NASA
  • PwC
  • Santander
  • Siemens
  • Telefónica
  • Televisa
  • Telmex
  • Transportation Security Administration
  • Verizon
  • ICA
  • ASA
  • Nielsen
  • Bosque Real
  • Logistik

Also: Cuadritos, Productora Nacional de Papel and Telemar.