Data centers

Industries

Load profile
Flat, continuous and growing. No seasonality and no scheduled shutdowns
Main problem
Available capacity in the area and continuity without exceptions
Distinguishing feature
Demand grows in large steps as the site fills up
Applicable families
D · Infrastructure · B · Storage and Backup · A · Diagnostics and Quality
At larger scale
Above 0.7 MW and at utility scale, development is led by GIS Power, of the same group

Here energy is not a cost. It is the availability of the service

Data centers, server rooms and critical loads. The only sector where an interruption of seconds has contractual consequences, and where the capacity available in the area decides whether the project exists.

The problemDoes it apply to me?What to do firstWhen it is not for you

This sector's problem

The real constraint is not the price of energy. It is whether the area's grid can give you the capacity.

A data center does not negotiate a tariff before it exists: it negotiates capacity. And in Mexico's industrial corridors, available capacity is today the variable that decides where you can build and how soon, not the cost of the kilowatt-hour.

When the service upgrade depends on a third party and your service plan already has a date, the question changes: what can be done inside the fence line while that gets resolved. Storage to defer the load increase, on-site generation to carry part of the growth, and an installation designed to grow in stages instead of being redone every time.

The second issue is the quality of the power that reaches the equipment. A data center is a purely electronic load, sensitive to transients, voltage sags and distortion, and with a backup architecture that has to be designed as a whole, not piece by piece.

01

The entry question

How much capacity is available at the point of connection, and how soon.

02

The answer inside the fence line

Storage to defer the load increase and sustain the transfer with no gap.

03

The design that avoids redoing

Infrastructure designed to grow in stages, with drawings and coordination kept up to date from day one.

Data centers.
Data centers
Metering at switchboards.
Metering at switchboards
Battery storage.
Battery storage
Switchgear and protection.
Switchgear and protection

Signs it applies

What you can read in your own operation

01

Committed load growth without confirmed capacity

This is the typical situation. It defines the whole project and should be raised before signing with the tenant.

02

Backup architecture without an integrated design

A backup generator, storage and transfer designed separately leave gaps that only show up in a real outage.

03

Sensitivity to transients and voltage sags

An electronic load does not tolerate what a motor does. It is measured before sizing the protection.

04

Need for evidence of continuity

If your service contract commits to availability, monitoring and reporting are not an extra: they are part of the deliverable.

How it is verified

In an initial review, with your bill on screen, we tell you what is worth measuring and what we would expect to find.

What to do first

How we come into a data center project

Through the capacity survey and the service entrance study. That is what tells whether the project exists at that site and on that timeline.

Then the complete electrical architecture: substation, distribution, backup and storage designed as a single system, with the protection coordination a critical load calls for.

And monitoring from day one, under a reliability contract. In this sector the monthly report is not an add-on service: it is the evidence that you are delivering what you sold.

If the project grows

When it requires a generation permit above 0.7 MW, participation in the electricity market or long-term capital, it is developed by GIS Power, of the same group, which currently evaluates projects above ten megawatts. You do not change providers: you change who signs the permit. We do the evaluation and the filing, and we stay at the table.

When it is not for you

What we will tell you not to do

We tell you at the first meeting

If your server room is small and what you really need is a properly sized UPS with maintenance, we will tell you. Not everything is an infrastructure project.

If the site has no available capacity and CFE's timeline exceeds your plan, that has to be said before spending on detailed engineering. It is the uncomfortable conversation we prefer to have at the start.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

We measure before we propose

Seven days with a Class A analyzer at your facility, before quoting.

02

One accountable partner

Engineering, supply and installation inside your fence line.

03

Diagnostic with no down payment

Fully creditable if you implement. No finding, no charge.

04

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

05

Operation and maintenance

GTO Vigía: monitoring, monthly reporting and priority service.

06

Third-party systems

We service plants installed by others, starting with a condition survey.