
Contact
In a short meeting, at your plant or online, we review your bill with you, on screen, and tell you what is worth measuring. You pay when the package pays for itself.
Who to talk to
Not everyone arrives with the same question, and putting everyone through the same funnel wastes time on both sides. Tell us up front and we will route you correctly.
This is the most common entry point. Book an initial review and we read it with you, on screen: demand charge, power factor and peak hours.
You have a deadline. Call us at +52 477 102 5023 and say so: that changes the priority and the scope, and it is usually a shorter job than a full diagnostic.
Condition survey. It applies even if someone else installed it, and it is quoted separately: it is useful to you even if someone else does the maintenance afterwards.
If you do not know which of the three you are in, it does not matter. Call and we will figure it out in five minutes.
What to have at hand
Twelve, not one. The weight of the demand charge and the power factor vary with the season and the production cycle. A single month leads to wrong conclusions. Having them at hand in the meeting is enough.
It shows your voltage level and your contracted demand. That is the data point that defines whether the Grid Code (Código de Red) applies to you.
"I received a notice", "my plant keeps going down", "the bill went up and I do not know why". That is worth more than a filled-in form.
We do not need drawings or an equipment inventory for the initial review. If they are needed later, we will ask then.
If you do not have the bills at hand, your CFE portal has them. If not, tell us and we will explain how to download them.
What happens next
First, the initial review. A short meeting with your bill on screen. We tell you what we see, what we would expect to find when measuring, and which solution family your profile points to.
Then the technical qualification visit. An hour or two at the plant to see the installation, the switchboards and the loads we suspect. That defines the metering scope — not a service catalog.
And then the diagnostic proposal. With scope, timeline and fee. No down payment, creditable against your investment if you implement with us, and no charge if the study does not find a profitable package.
We will not call you every week. We will not send you a proposal without presenting it. And we will not quote equipment before we have measured: it is the one house rule that is not negotiable.
Form
The consumption and demand charge fields are optional: if you do not know them, we go over them together on the bill. All we really need is how to reach you and what concerns you.

Energy solutions
In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.
We work with plants on medium and high voltage. By sending you accept our privacy notice.
Strengths
GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.
Seven days with a Class A analyzer at your facility, before quoting.
Engineering, supply and installation inside your fence line.
Fully creditable if you implement. No finding, no charge.
Compliance reports based on RES/550/2021, filed with the CNE and CENACE.
GTO Vigía: monitoring, monthly reporting and priority service.
We service plants installed by others, starting with a condition survey.