Process chemicals, pharmaceuticals, cosmetics and cleaning products. Continuous plants where power quality is measured in lost product, not on the bill.
This sector's problem
A voltage sag lasts a fraction of a second and does not appear on the CFE bill. But it is enough for a drive to trip, an agitator to stop or a controller to lose its step. In a batch process that can mean restarting, reprocessing or scrapping the batch.
The source can be outside, on the grid, or inside, in large motor starts and poorly tuned capacitor banks. Without measurement you cannot tell which, and the solution is different in each case.
These plants also use steam and hot water all year round. It is the entry condition for cogeneration, which here also helps continuity.
A Class A analyzer that captures every sag, its depth and its duration during the measurement campaign.
What comes from the grid is separated from what is generated inside. It changes the solution completely.
Drive settings, backup or storage, only for the loads that ruin the batch.




Signs it applies
If a stoppage shows up in the log with no mechanical fault, the first suspect is a voltage event.
The drive logs the event. That log is the starting point for the measurement.
The entry condition for evaluating cogeneration.
Many drives without filters. The spectrum is measured before buying capacitors, so as not to create resonance.
In an initial review, with your bill on screen, we tell you what is worth measuring and what we would expect to find.
What to do first
Measurement first: a seven-day campaign with a Class A analyzer, logging events as well as consumption.
Then, ride-through for the critical loads: drive settings, backup or battery storage for what cannot go down. What ruins the batch is protected, not the whole plant.
Cogeneration last, if steam is used for much of the year and the measurement confirms the thermal demand.
Work inside classified areas is planned with your quality team and under your procedures. We do not enter a clean area without that agreement.
When it is not for you
If your stoppages have a known mechanical or process cause, we will not sell you a backup system. First, measurement confirms that the source is electrical.
If your plant does not use steam or hot water continuously, cogeneration does not pay for itself. We tell you before quoting it.
How we work
Seven-day campaign with a Class A analyzer.
Engineering based on your real load curve.
Supply and installation inside your fence line.
GTO Vigía sustains the result after construction.

Energy solutions
In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.
We work with plants on medium and high voltage. By sending you accept our privacy notice.
Strengths
GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.
Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.
Compliance reports based on RES/550/2021, filed with the CNE and CENACE.
We service plants installed by others, starting with a condition survey.