What an investment-grade audit is and how it differs from a savings study

Almost any provider can hand you a document that says how much you would save. Very few deliver one that a committee or a bank can make a decision with. The difference comes down to four concrete things.

Two engineers review measurement data at a plant.
A serious audit starts from data measured at the plant, not from assumptions.

The problem with the conventional savings study

The format is familiar: a plant walkthrough, a list of measures, an estimated savings percentage for each and a payback period. It looks complete and is usually well intentioned.

The problem shows up when someone asks where the percentage came from. It almost always comes from a typical factor in the literature applied to annual consumption — not from a measurement at that plant. And when the measure is implemented and the savings do not appear, there is no way to know whether the measure failed, production changed, or the number was never realistic.

An investment committee that has lived through that once will not approve on the basis of that document again. And it is right.

Requirement one: adjusted baseline

Savings are a subtraction against something. That something is the baseline, and if it is not adjusted, the subtraction means nothing.

Adjusting means correcting for the variables that changed and have nothing to do with the project: production, temperature, number of shifts, working days. If your plant produced 18 % less in the project year, your consumption fell for reasons you owe to no one.

Without an adjusted baseline, any result is debatable, and it will be debated — usually by finance, usually the following year.

Figure 1
The baseline you subtract from decides how much savings appear
CONSUMPTION, kWh PER MONTH Less production: not savings Real savings Unadjusted baseline Adjusted baseline Actual consumption Apparent savings JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Against the unadjusted baseline, the whole space between the lines looks like savings; against the production-adjusted baseline, only the cyan band is. Illustrative data.

Requirement two: measurement and verification plan

The plan is written before implementation, not after. It defines what will be measured, with which instrument, at which point, how often, and how savings will be calculated from that.

The reference is IPMVP, the International Performance Measurement and Verification Protocol. It is not a decorative seal: it is the method that lets two parties with different interests —you and the provider, or you and whoever finances— arrive at the same number.

A study without an M&V plan can promise whatever it likes, because it does not define how it would be verified.

Requirement three: quantified uncertainty

A number without a range is an opinion with decimals. Every measurement has uncertainty, and stating it does not weaken the study: it makes it credible.

The difference between "will save 1.2 million a year" and "will save between 1.0 and 1.35 million a year, under these assumptions" is the difference between a brochure and a document you can make a decision with.

Whoever does not state their uncertainty either did not calculate it or would rather you not see it.

Figure 2
A number with its range can be checked; a number alone cannot
HOW IT IS ALMOST ALWAYS PRESENTED A number alone “Will save 1.2 million a year” 1.2 If the result comes out different, there is nothing to compare it against HOW A DECISION CAN BE MADE The same number with its range “Between 1.0 and 1.35 million, under these assumptions” 1.2 1.0 1.35 Stated uncertainty band MILLION PER YEAR
The central value is the same in both cases. The band says which result would be normal and which would indicate that something failed, and that is what a committee or a bank needs to decide.

Requirement four: return measure by measure

A package with an overall return hides that inside it are measures that pay back in months and measures that never pay back, averaged into a single attractive number.

Separated, you can decide: implement the first three this year and leave the rest for when there is budget. Together, you have to take it or leave it.

That separation is also what lets you start small. Most projects that work started with the shortest-payback measure, not the biggest one.

What all this does in practice

It makes the study financeable. A document with an adjusted baseline, an M&V plan, stated uncertainty and return per measure is the one a committee approves and a financial institution can read.

And it changes the conversation with the provider. When the verification method is written in advance, the result stops being a matter of opinion at the end of the project.

It is more work and costs more than a checklist walkthrough. That is why we first ask what you need it for: if what you urgently need is a report to submit, that is a shorter, cheaper scope, and we tell you so.

How to spot it in a proposal

Ask three things: how they will adjust the baseline, what the M&V plan is and what the uncertainty of the number is. If all three answers exist, you have an investment-grade study. If not, you have an estimate.

Keep reading

Related

Download Brochure

Energy solutions

Download here

Would you like to know where your plant overspends?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

We measure before we propose

Seven days with a Class A analyzer at your facility, before quoting.

02

One accountable partner

Engineering, supply and installation inside your fence line.

03

Diagnostic with no down payment

Fully creditable if you implement. No finding, no charge.

04

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

05

Operation and maintenance

GTO Vigía: monitoring, monthly reporting and priority service.

06

Third-party systems

We service plants installed by others, starting with a condition survey.