GTO Energy · Energy Experts Contact
Open battery energy storage container, with lithium module racks, raceways and perimeter protection, on a concrete slab.

BESS Storage

Storage and Backup

Who it applies to
Plants on GDMTH or DIT with peak-hour spikes, or processes that cannot tolerate interruptions
Practical threshold
From 150,000 kWh/month, with demand charges above 25% of the bill
What we assess
12 months of load profile and your billing breakdown
Deliverable
Sizing, operating strategy and payback by scenario
Integration
With existing or new solar generation
Operation
Under a GTO Vigía contract

The most expensive energy of the day is what you use at peak

Lithium battery systems for peak shaving, time-of-use arbitrage and backup during grid outages.

The two usesPeak shaving The design trade-offWhat we doQuestions

The two uses

They are two different businesses, and it pays not to confuse them

01

Load shifting — moving consumption to other hours

On the GDMTH tariff you pay three energy prices depending on the hour, and you also pay for the maximum demand recorded in the month. The battery charges off-peak and discharges at peak: it cuts your energy price and your billable demand peak. It does not change what your plant consumes; it changes when you are charged for it.

02

Backup — keeping the plant running

A thirty-second interruption in a continuous process costs hours of restart and sometimes lost product. The system carries the critical loads while the backup generator comes online, or covers the whole gap if the outage is short.

Battery storage.
Battery storage
Backup generator.
Backup generator
Switchgear and protection.
Switchgear and protection
Point of connection.
Point of connection

Peak shaving

What the battery takes off your bill

The savings have two components that add up: the energy you stop buying at the peak price, and the kW of billable demand you no longer record. The second is usually the larger one, and it is the one almost nobody calculates correctly.

Demand profile · typical dayGDMTH tariff
04008001200 kW −400 kW billable demand OFF-PEAKMID-PEAKPEAK 00:0006:0012:0018:0024:00 battery charging
Without batteriesWith batteries

Illustrative example of a plant on GDMTH. The actual reduction depends on your measured load profile, not on a rule of thumb.

The design trade-off

The battery that maximizes savings is empty by the end of the peak

And the one that provides backup needs a reserve. Sizing for both at the same time is the real work, and it is where it is decided whether the project pays for itself or not.

State of charge throughout the day% of capacity
0%50%100% untouchable backup reserve chargeavailabledischarge 00:0006:0012:0018:0024:00

Every percentage point of reserve you set aside for backup is savings you stop capturing. How much to set aside is not a technical decision: it is a business decision about how much an hour of downtime costs you.

The question we will ask you

How much does an hour of unplanned downtime cost you? With that number, sizing becomes arithmetic. Without it, any backup proposal is a hunch with an invoice.

What we do

From load profile to commissioning

Everything starts with twelve months of real data. Without that, sizing a battery bank is guessing at list price.

01

Analysis and simulation

12-month load profile and savings simulation for each sizing scenario.

02

Design and operating strategy

Capacity, power, and the rules the system uses to decide when to charge and when to discharge.

03

Supply and installation

Integration, protection, electrical works and commissioning.

04

Solar integration

On an existing or new system, with the appropriate electronics and controls.

05

Operation and maintenance

Under a GTO Vigía contract, with performance reporting against what was promised.

Questions

What clients ask before hiring us

How long is the payback?
It depends almost entirely on two things: how pronounced your peak-hour spike is and how much billable demand you can cut. In plants with sharp peaks the periods are reasonable; in plants with a flat load, storage for savings makes no sense — and in that scenario we tell you so.
Do I need solar to install batteries?
No. Time-of-use arbitrage and peak shaving work by buying cheap grid energy during off-peak hours. Solar improves the overall system, but it is not a requirement.
How long does the battery last?
Service life is measured in cycles and depends on the depth of discharge you operate it at. That is why the operating strategy matters as much as the equipment: aggressive operation buys more savings today in exchange for fewer years of life.
Can it carry the whole plant if CFE power goes out?
It rarely makes sense to size it for that. The usual approach is to carry the critical loads — controls, instrumentation, pumps, whatever prevents downtime and scrap — and leave the rest out. That selection is made with your maintenance team.
When it is not for you

If your load curve is flat and shows no spikes during peak hours, storage for savings does not pay for itself. If you also have no processes that suffer from an interruption, there is no backup case either.

If you are on a low-voltage tariff with no demand charge, your money almost certainly goes further in one of the other six solutions.

How we work

One accountable partner, from metering to operation

We measure

Seven-day campaign with a Class A analyzer.

We design

Engineering based on your real load curve.

We build

Supply and installation inside your fence line.

We operate

GTO Vigía sustains the result after construction.

Download Brochure

Energy solutions

Download here

Interested in a storage project?

In a short meeting we review your bill with you, on screen, and tell you what is worth measuring.

We work with plants on medium and high voltage. By sending you accept our privacy notice.

Continue with

Related services

Strengths

What backs every project

GTO Energy offers electrical engineering tailored to your plant. Request your diagnostic and start by knowing where the opportunity is.

01

Diagnostic with no down payment

Fully creditable if you implement. No charge if we find no package that pays back in under 4 years.

02

Current regulation

Compliance reports based on RES/550/2021, filed with the CNE and CENACE.

03

Third-party systems

We service plants installed by others, starting with a condition survey.

Partners with trademark-use authorization

  • Jenbacher
  • Guascor Energy
  • Hering
  • Pylontech
  • Huawei

Group clients since 1983

  • alestra
  • AT&T
  • Banamex
  • BBVA
  • The Walt Disney Company
  • HSBC
  • Lockheed Martin
  • NASA
  • PwC
  • Santander
  • Siemens
  • Telefónica
  • Televisa
  • Telmex
  • Transportation Security Administration
  • Verizon
  • ICA
  • ASA
  • Nielsen
  • Bosque Real
  • Logistik

Also: Cuadritos, Productora Nacional de Papel and Telemar.